We are offering DG Synchronizing Panel which is based on load in KW. Hence the actual sharing, starting, stopping & transfers are actual load dependant. DG Syncronising Panel.

DG-Synchronizing-Panel

WHY SYNCRONIZING?

  1. Preventive: Less mechanical stress on gensets
  2. Flexible : Easy maintenance
  3. Power optimization : Ideal genset operating run
  4. Reliable : Security with redundancy
  5. Responsive : Better response to load impacts
  6. Expandable :

No limit Power Plant extension We are offering DG Synchronizing Panel which is based on load in KW. Hence the actual sharing, starting, stopping & transfers are actual load dependent & not on any other unrealistic parameter like voltage, current. etc. Changing of scheme becomes very easy because of changes are made through software only. There is no changing of wires, adding of components like relays, contactors, which is very time consuming, cumbersome & requiring additional space.

Along with KW sharing, KVAr sharing & PF sharing is very accurate, because of PLC programming. There is no possibility of any unequal sharing as regards KW, KVAr & PF. For any type of load addition or reduction, manual intervention as regards D.G.set operation is not required. However, in case of emergency manual override is possible. Special programmers using Real Time Clock (RTC) are possible. Because of KW dependent load sharing, optimum utilization of D.G. sets are possible. This increases D.G. sets efficiency & saves lot of fuel.